Versioning & Change Control

Purpose

This page defines how GTAF remains a stable, licensable reference over time while still evolving. Versioning and change control ensure that:

  • artifact meaning is interpretable relative to a GTAF reference version,
  • “GTAF conformity” is a time‑ and scope‑bound claim, not a vague statement,
  • structural rules (invariants) remain enforceable without turning into consulting‑heavy negotiation.

Versioning in GTAF is not primarily about software release mechanics; it is about preserving normative meaning.

Scope

This section specifies:

  • GTAF reference versions and their semantics,
  • artifact revisions vs reference versions,
  • breaking vs non‑breaking changes,
  • deprecation policy and lifecycle states,
  • migration rules (how artifacts move across reference versions),
  • change authority (who may decide what changes),
  • event‑based revalidation triggers (when changes invalidate readiness).

Not in scope:

  • tool‑specific workflows (Git, Jira, pipelines),
  • certification programs or external audit formats.

Core concepts (normative)

V1 - Two-layer versioning: Reference vs Implementation

GTAF uses two distinct version layers that must never be confused:

  1. GTAF Reference Version (gtaf_ref.version): the global, normative definition of artifact types, required fields, invariants, and interpretation rules.

  2. Implementation-layer lifecycle (artifact revisions + validity windows): the local evolution of concrete SB/DR/RB/DRC/EIS/DRB/DVM artifacts within a scope, tracked via revision and bounded by valid_from / valid_until (or review cycle).

Normative rule: every artifact MUST bind to a GTAF reference version. Artifacts without gtaf_ref.version are structurally uninterpretable and cannot support readiness.

Practical implication: a scope may be fully up-to-date on its artifacts (ACTIVE, within validity) and still be non-conformant if it does not declare the correct GTAF reference version.

Example (minimal): - A team operates with ACTIVE SB/DR/RB/DRC within valid windows, but gtaf_ref.version is missing → NOT_CONFORMANT. - The same artifacts declare gtaf_ref.version = GTAF-0.1 and are within validity → potentially CONFORMANT (subject to risk-class rules and evidence).

GTAF reference version semantics (normative)

Reference version format - GTAF-MAJOR.MINOR (e.g., GTAF-0.1, GTAF-0.2) - optional pre‑release: GTAF-0.1-rc1 (internal staging only)

Meaning of version increments - MAJOR: breaking normative change (can invalidate artifact sets or change interpretation rules) - MINOR: additive or clarifying change (new optional fields, new optional artifact types, clarifications) - PATCH (optional): editorial fixes only (non‑semantic)

Normative rule: any change that alters a required field set, an invariant, or the interpretation of an existing field is a MAJOR change.

Artifact lifecycle states (normative)

Artifacts MUST use the lifecycle states defined in the global schema:

  • DRAFT: exists but not claimable for readiness
  • ACTIVE: valid and claimable (within validity window)
  • DEPRECATED: still valid but scheduled for replacement/removal; must have a successor plan
  • RETIRED: no longer valid; kept for traceability only

Deprecation requirements (normative) If an artifact becomes DEPRECATED, it MUST contain:

  • deprecation.reason
  • deprecation.successor_ref (new artifact ID or planned replacement)
  • deprecation.sunset_date (after which it becomes RETIRED)

Change classes (breaking vs non-breaking)

Non‑breaking changes (allowed under MINOR) - adding optional fields - introducing a new lifecycle artifact not required for existing A/B scopes - clarifying text/definitions/examples without changing invariants - adding additional DVM metric definitions without making them mandatory for existing classes

Breaking changes (require MAJOR) - introducing a new required field for SB/DR/RB/DRC - changing the meaning of an enum value - tightening an invariant (e.g., making EIS mandatory for Class B) - changing what “PERMITTED” means in DRC logic - changing scope taxonomy in a way that reinterprets existing claims

Normative rule: a breaking change MUST include an explicit migration path.

Authority & governance of changes (normative)

Changes to the GTAF reference are decided by a designated authority (e.g., “GTAF Reference Stewardship”).

Minimum requirements:

  • reference_change.authority_role exists
  • change proposals are recorded as structured Reference Change Records (RCR)

RCR is the canonical change log entry for the GTAF reference. It SHOULD include:

  • RCR-ID
  • affected reference version target
  • change type: breaking / non‑breaking
  • rationale
  • impacted artifacts/invariants
  • migration notes
  • adoption timeline

This keeps reference evolution auditable without turning into a training/consulting product.

Migration & compatibility (normative)

Compatibility modes

  1. Strict compatibility (preferred): artifacts created under reference version X remain interpretable under X.

  2. Declared migration: artifacts are formally migrated to reference version Y via controlled steps.

Normative rule: “GTAF conformity” claims MUST specify the reference version they refer to. A claim without version is invalid.

Migration requirements When migrating a scope from reference X → Y, the migration MUST:

  • list all impacted artifact types
  • identify any missing required fields introduced by Y
  • update invariants and re‑run readiness validation (DRC)

Migration result is a new state Migration is not a silent reinterpretation. It yields:

  • new artifact revisions (same IDs) or successor artifacts (new IDs)
  • updated gtaf_ref.version
  • updated change_reason
  • new DRC issuance for any semi/autonomous contexts

Event-based revalidation triggers (normative)

Even without a reference version change, the following events MUST trigger review and may invalidate readiness:

Triggers related to boundaries (SB) - boundary changes (included/excluded components) - interface changes (new allowed interfaces, increased access) - legal/org mapping changes (ownership shifts, outsourcing, mergers)

Triggers related to decision spaces (DR) - changes to allowed actions or impact limits - delegation level changes - new triggers or altered escalation paths - expiry policy changes

Triggers related to responsibility (RB) - role changes (outcome owner, escalation owner) - mandate changes (board/charter updates) - handover events without explicitly preserved accountability

Triggers related to operation (DRB/EIS/DVM) - changes to review frequency in medium/high risk scopes - changes to kill‑switch authority or reachability assumptions - threshold changes that affect when intervention is required

Normative rule: any trigger event in a scope containing autonomous or semi‑autonomous delegation MUST cause DRC to be reissued (or explicitly invalidated).

Validity windows vs version changes (normative)

Validity windows apply at artifact level (SB/DR/RB/DRC…) and are independent from reference version changes. However:

  • a reference MAJOR change SHOULD force review of all ACTIVE artifacts in the affected scope,
  • a scope may run multiple reference versions across different scopes, but within a single scope, mixed versions SHOULD be avoided unless explicitly justified.

Claim format: GTAF conformity statement (normative)

Any statement of conformity MUST be expressible as:

Conformity Claim = (Scope, GTAF Reference Version, Time Window, Evidence References)

Minimum claim fields:

  • scope.id
  • gtaf_ref.version
  • valid_from, valid_until
  • claim.basis: list of relevant DRC IDs (or a DRC set)
  • optional: risk class

Without these fields, the claim is structurally undefined and must be treated as marketing, not reference validity.

Deprecation strategy (practical, normative intent)

When to deprecate - an artifact is superseded by a clearer boundary/decision structure - a mandate model changed - a scope split/merge requires new IDs or successor structures

What deprecation prevents Deprecation prevents “silent drift”: old assumptions remain referenced long after reality changed.

Guardrails

  • Versioning must not become a consulting product. The reference must remain self‑contained.
  • Change control must not become bureaucratic theater; it preserves normative meaning.
  • Avoid “implicit upgrades.” If interpretation changes, it is a MAJOR change.