Purpose
This page specifies the normative criteria for assigning risk class per scope and decision domain.
Normative rule
Risk class MUST be determined using the criteria below, assessed per scope and per decision domain.
C1 - Impact domain (what can be harmed)
- Financial: potential monetary loss or unauthorized transfers
- Safety: physical harm risk
- Rights & legal status: eligibility, access, employment, sanctions
- Data: confidentiality/integrity of sensitive or regulated data
- Continuity: ability of the organization to operate
- Reputation: public trust damage and downstream consequences
C2 - Magnitude (how large)
- maximum potential loss (bounded/unbounded)
- number of affected users/entities
- systemic coupling (single subsystem vs platform‑wide)
C3 - Reversibility (how recoverable)
- rollback feasible within minutes/hours/days?
- harm fully undoable or only partially mitigable?
- external/legal facts created (contracts, reporting)?
C4 - Time-to-harm (how fast)
- immediate harm possible (seconds/minutes)
- delayed harm (hours/days), allowing human intervention
C5 - Control surface (how bounded)
- boundaries enforceable and narrow?
- escalation and kill‑switch paths reachable under stress?
- observability/traceability required
C6 - Delegation level (autonomy amplifier)
- assistive
- semi‑autonomous
- autonomous
Higher autonomy MUST shift classification upward unless compensated by strict boundaries and low impact.
C7 - Regulatory environment
- regulated industry, regulated data, critical infrastructure
- contractual liability and external audit exposure
Normative rule
A scope MUST be Class C if any criterion indicates severe/irreversible harm potential with insufficient recovery time or high regulatory/legal consequence.